1. Inspect protection and rectification
With power removed and capacitors safely discharged, inspect the fuse, surge protection, NTC, bridge rectifier and switching devices. A blown fuse is a symptom; determine why it opened before replacing it.
2. Check for shorted power semiconductors
Use resistance or diode-mode checks to look for obvious shorts in the bridge rectifier and primary switching MOSFET. In-circuit readings can be influenced by parallel paths, so suspicious results may require isolation.
3. Verify the DC bus only when safe
During an energized test, the bulk capacitor should charge to a high DC voltage appropriate to the input and topology. An absent or collapsing bus indicates a problem before or around the rectification stage.
4. Evaluate controller supply and switching
Check the PWM controller’s supply conditions and whether its startup threshold is reached. If switching begins, use appropriate measurement techniques to determine whether it remains stable or is stopped by protection.
5. Connect primary results to secondary behavior
A healthy primary switching stage with no usable output shifts attention toward transformer transfer, secondary rectification, output loading and feedback.
Bring related SMPS measurements into one workflow.
BoardIQ helps connect primary-side and secondary-side readings so the diagnostic path remains clear.
Explore BoardIQ →